Cheating on the N Queens benchmark

Geoffrey De Smet
Keep up with Timefold
Product updates, optimization insights, and stories from the builders behind PlanningAI.
Share

Many Solver distributions include an N Queens example, in which n queens need to be placed on a n*n sized chessboard, with no attack opportunities. So when you’re looking for the fastest Solver, it’s tempting to use the N Queens example as a benchmark to compare those solvers. That’s a tragic mistake, because the N Queens problem is solvable in polynomial time, which means there’s a way to cheat.

That being said, OptaPlanner solves the 1 000 000 queens problem in less than 3 seconds :) Here’s a log to prove it (with time spent in milliseconds):

INFO  Opened: data/nqueens/unsolved/10000queens.xml INFO  Solving ended: time spent (23), best score (0), ...INFO  Opened: data/nqueens/unsolved/100000queens.xml INFO  Solving ended: time spent (159), best score (0), ...INFO  Opened: data/nqueens/unsolved/1000000queens.xml INFO  Solving ended: time spent (2981), best score (0), ...

How to cheat on the N Queens problem

The N Queens problem is not NP-complete, nor NP-hard. That is math speak for stating that there’s a perfect algorithm to solve this problem: the Explicits Solutions algorithm. Implemented with a CustomPhaseCommand in OptaPlanner it looks like this:

public class CheatingNQueensPhaseCommand implements CustomPhaseCommand {

   public void changeWorkingSolution(ScoreDirector scoreDirector) {
       NQueens nQueens = (NQueens) scoreDirector.getWorkingSolution();
       int n = nQueens.getN();
       List<Queen> queenList = nQueens.getQueenList();
       List<Row> rowList = nQueens.getRowList();

       if (n % 2 == 1) {
           Queen a = queenList.get(n - 1);
           scoreDirector.beforeVariableChanged(a, "row");
           a.setRow(rowList.get(n - 1));
           scoreDirector.afterVariableChanged(a, "row");
           n--;
       }
       int halfN = n / 2;
       if (n % 6 != 2) {
           for (int i = 0; i < halfN; i++) {
               Queen a = queenList.get(i);
               scoreDirector.beforeVariableChanged(a, "row");
               a.setRow(rowList.get((2 * i) + 1));
               scoreDirector.afterVariableChanged(a, "row");

               Queen b = queenList.get(halfN + i);
               scoreDirector.beforeVariableChanged(b, "row");
               b.setRow(rowList.get(2 * i));
               scoreDirector.afterVariableChanged(b, "row");
           }
       } else {
           for (int i = 0; i < halfN; i++) {
               Queen a = queenList.get(i);
               scoreDirector.beforeVariableChanged(a, "row");
               a.setRow(rowList.get((halfN + (2 * i) - 1) % n));
               scoreDirector.afterVariableChanged(a, "row");

               Queen b = queenList.get(n - i - 1);
               scoreDirector.beforeVariableChanged(b, "row");
               b.setRow(rowList.get(n - 1 - ((halfN + (2 * i) - 1) % n)));
               scoreDirector.afterVariableChanged(b, "row");
           }
       }

   }

}

Now, one could argue that this implementation doesn’t use any of OptaPlanner’s algorithms (such as the Construction Heuristics or Local Search). But it’s straightforward to mimic this approach in a Construction Heuristic (or even a Local Search). So, in a benchmark, any Solver which simulates that approach the most, is guaranteed to win when scaling out.

Why doesn’t that work for other planning problems?

This algorithm is perfect for N Queens, so why don’t we use a perfect algorithm on other planning problems? Well, simply because there are none!

Most planning problems, such as vehicle routing, employee rostering, cloud optimization, bin packing, …​are proven to be NP-complete (or NP-hard). This means that these problems are in essence the same: a perfect algorithm for one, would work for all of them. But no human has ever found such an algorithm (and most experts believe no such algorithm exists).

Note: There are a few notable exceptions of planning problems that are not NP-complete, nor NP-hard. For example, finding the shortest distance between 2 points can be solved in polynomial time with A*-Search. But their scope is narrow: finding the shortest distance to visit n points (TSP), on the other hand, is not solvable in polynomial time.

Because N Queens differs intrinsically from real planning problems, it is a terrible use case to benchmark.

Conclusion

Benchmarks on the N Queens problem are meaningless. Instead, benchmark implementations of a realistic competition. A realistic competition is an official, independent competition:

  1. that clearly defines a real-word use case
  2. with real-world constraints
  3. with multiple, real-world datasets
  4. that expects reproducible results within a specific time limit on specific hardware
  5. that has had serious participation from the academic and/or enterprise Operations Research community

Related blogs
June 25, 2026
0
min

Same coffee, same shoes, same plan: the beauty of no surprises

Optimization
Explainable AI
June 23, 2026
0
min

Timefold Raises $13M as AI Drives Demand for Routing and Scheduling APIs

Press
June 1, 2026
0
min

How upskilling technicians unlocks field service routing efficiency

Explainable AI
FSR
Platform
May 4, 2026
0
min

How much fuel can route optimization actually save?

FSR
Scheduling intelligence
Platform
May 1, 2026
0
min

Three optimizations to make your Timefold Solver faster

Solver
Open-source
April 24, 2026
0
min

Timefold Solver 2.0 upgrade: 15 projects, under 10 minutes

Solver
Open-source

When scheduling works, everything works.

Less waste. More control. Teams that trust the plan.